TA Electrical took on another job far away from home in May 2013 and travelled this time to Spearwood, Western Australia to complete a job that was tendered and won with Australian Wool Handlers. This project was one of the biggest thus far with a 180 metres long 3 phase 1000 Amp underground supply to be installed to feed 3 wool dumping presses and a 300 metre cable tray system to be designed and erected. Each dump was then supplied with a 400 Amp supply and individual metering to monitor the power usage.